COMPOSITE ARCH BRIDGE

ABSTRACT

 BACKGROUND

 RESEARCH OBJECTIVES

  BRIDGE CONSTRUCTION

FUNDING AGENCIES

 

Composite Arch Bridge

 
Preparation before Casting

Fabrication of Bridge Components

Preparation Before Casting
Casting Concrete
Construction Sequence
Aurora Arch Bridge
 Home

 

Spacers at 4 ft spacing to hold the Dywidag rod at the middle of the straight pipe

 

Confinement of the Dywidag rod at the base section

 

                                       

Straight pipes connected to the base section to form the lower chord segments