Two concrete
abutments with base plates embedded in concrete |
 |
Part
of the bridge components before assembly |
 |
The floor beams
were placed first
|
 |
The
lower chord was placed next
|
 |
All four straight pipes are in place |
 |
The lower chord is connected to the
floor beam with the brackets |
 |
The two straight segment were spliced
and ready for grouting |
 |
Assembled look of the bottom portion of